Finally. And Happy New Year

IMG_7838

Happy New Year, everyone.

I thought I’d post an end of year report on our home and where we are. I’m going to clear out the negative right off the bat so we can begin the year very positively.

No two ways about it, but living in your trailer in your own driveway for 5 1/2 months is tough. Summer wasn’t bad, but once the weather turned it was hard, dirty and claustrophobic. We need a bigger trailer – like a 27 foot Eddie Bauer for us and our big ole dog. But we did it – and we’re still together (that’s a major plus).

I’ve learned way more than I ever wanted to learn about project managing the construction process of remodeling a house. Alas, we hired Broadmore Builders to do that, and our project manager was the worst manager of anything I’ve ever come across enabled by the business’ owner who made all kinds of excuses for him. The project manager was inept, full of lies, talked bad about his workers and clients in front of other people, a hothead, and accusatory. All bad traits in a human being. We are glad to be done with Broadmore Builders for that. On the plus side, their workers, Juan, Ivan and Leo were fun to be around and we miss them – they did all the work. I just wish they were treated more fairly and better. They are immigrants and they receive no healthcare even though we were told they did.

The initial company we hired, Batt + Lear, who took us to the cleaners for a fair amount of money for nothing we could ever use, apparently does the same thing to other people. We’ve heard from other couples who’ve had the same, if not worse, experience with them – which tells us we weren’t crazy. I hope that this year, they will learn that their business model – that of screwing their customers – will force them to close.

Unfortunately, our experiences with these two companies put a real damper on the excitement and joy of creating a new space.

Now on to the positive to ring in 2015.

IMG_8046IMG_8050IMG_8336

IMG_8333

We are living in a wonderful new home that our neighbors and friends are loving being in as much as we are. We’ve hosted family and friends for Thanksgiving and Christmas and everything has gone great. John loves the new kitchen and being able to cook and create in it. I’m loving it for being able to work and still talk to people and engage with our guests. It’s fantastic. A big shout-out to Joy Dolling at Abodian Cabinets here in the Rainier Valley for their fine work and good humor.

IMG_8427

IMG_8002

The glass backsplash is finally complete and the kitchen now looks sleek and contemporary. We love it.

IMG_8368

The bathrooms are extremely well done thanks to our wonderful tiler, Steve Branca, who has been meticulous. We still have the upper shower to go, but that should be done soon.

IMG_8388

IMG_8387

The finish work is nearly finished – we are waiting on framing for our deconstructed looking fireplace, but we’ve already picked out the tile we want to use and it will be great. Christopher Olson was the finish carpenter and did a great job on installing our cabinets, doing the window sills, baseboards and door casings.

IMG_8425 IMG_8426

The trim painting, though initially we were really bummed to be kicked back out to the trailer for a week, was done by DK Professional Painting. Julio, the foreman, did a great job with his team in making all of the trim look evenly painted and beautiful. They also stained and lacquered the window sills throughout the house.

The floors are amazing. Working with four totally different floor materials, adding in new material and fixing bad stains throughout, Eurocraft floors had their hands full. But they did amazing work, and blended all of them together beautifully.

John and myself painted all of the colored walls, lacquered the doors and have installed a lot of hardware. We’re continuing to work on putting things together and we are just now having the cabinetry installed in the laundry/mud room.

IMG_8372

My favorite room is the bedroom. It is such a beautiful and restful space where the light and views are amazing, and it’s cozy and warm to read and sleep in. It just feels fantastic and we both love to hang out there.

IMG_8391

We are just now starting to enjoy the home – the stress of building it is wearing off for me, and the people coming over and staying with us are making it feel like a home. We still have much to do in the yard, basement and then, ultimately, the DADU (Backyard Cottage), but we can wait on that for a bit.

We have to give another shout out to our architect and friend, Katie Wells-Driscoll, who really helped us visualize the entirety of our property that, when complete, will be extraordinary and help us live here for many years to come. If you’d like her contact info, please give us a call.

IMG_7884

Today, the view is spectacular with snow on the mountains and hardly a cloud in the sky. It’s a bit brisk to sit outside, but we stand on the deck and just admire all we can see, and wonder at all we’ve accomplished in 2014.

There is much to look forward to in 2015 with a brand new grandchild named Carson who arrived on the 28th, our wedding in July and visits from all kinds of friends and family. In February, we are headed to Florida to see the grandchildren and John’s family and friends. My hope is to have a new job I love while John continues teaching music to K-4th graders in the Bellevue School District.

IMG_8230

We also hope to reconnect with our fellow ‘streamers in Oregon and elsewhere. Margaret is in the shop getting repairs done before our warranty wears off and then we’re off to places unknown. In the meantime, we’ve put her up on Airbnb.com if you or anyone wish to stay. Check out the link here: https://www.airbnb.com/rooms/4461706

Our best to all of our friends and family, the readers of this blog, and anyone working on their homes in the coming year. May 2015 be one of the best years ever.

Seven/Eight Weeks Down – More Heat, More Rain, More House

IMG_6949

IMG_6881

Wow, did we start the seventh week out super hot, which continued through that Thursday. This whole house thing is becoming a blur, thus the late weekly report. Finishing up the top floor was a priority as roofing was to begin on Friday.

IMG_6984

So up went the rest of the walls, the new dormers were done and the facia installed all around the house’s perimeter.

IMG_6966

Very time consuming work, but worth it as small details like diamonds at the points finished off the look. Our crew, Ivan, Juan and Leo, continue to work very hard. We think they are great.

IMG_6936

We found this tiny toy in the walls with a little wooden car, so he hung from a nail throughout the week as inspiration.

Sadly, the last couple of weeks got away from me to do the updates, but suffice it to say, we were super busy trying to get all the details in place so that we can get into the house sometime after Labor Day as John has been offered a new job with Bellevue School District as a music teacher.

We lost our bathroom finally and completely. It’s a challenge, but we have wonderful neighbors in the Bush’s and others who’ve offered so we’re using their place to shower and wash clothes.

IMG_6935

Keeping the Airstream clean is a challenge with all the dust, and now we have a list running of eight different things that need to be looked at. We have an appointment this coming Friday to deal with all of the issues: a broken air conditioner, two leaks, missing rivets, etc. We’re wondering if our model is up to snuff and lust after the Eddie Bauer model, which seems tougher.

IMG_6979

The main floor got more support from additional beams installed in the basement and the main floor. Most of the framing is complete now.

IMG_6987

Upstairs, our five foot sliding door became an eight foot slider. A happy mistake as the look will be cleaner and the windows very large. Speaking of windows, they get installed this week.

IMG_6879

In the eighth week, there was rain. Lots of it. Biblical, in fact. As our weather patterns change, and the world copes with more severe storms, we only hope that our house will be strong enough to endure. With all of the nails and wood that have gone in to the framing, we think it will. And we were lucky that the roof was completed the day before the storm.

IMG_6964

Last Thursday, the decks got torched down by the roofers and now their work is complete. We are continuing to research rail systems and are banking on cable railing, which, of course, is the more expensive, but less intrusive on the view. We will most likely choose them.

IMG_6992

Sunrises and sunsets continue to inspire. SeaFair is next up on the agenda. Our neighborhood becomes party central, particularly next door when the clowns arrive. We are not going to promote a party this year as we don’t have railings, a bathroom, nor a kitchen. Low key is where it’s at for us. Luckily, we’ve been invited to several neighborhood parties.

At the end of the eighth week, we are getting weary, or at least I am. John is continuing to be diligent on details and measurements, working out kitchen cabinetry and the mud/laundry room.

IMG_6995

Buster is being the amazing dog that he is, greeting and escorting neighbors up and down the property, meeting lots of new dogs, and generally just living through all the chaos like a champ.

10462829_10154446675800515_5399021880244776736_n

I’m feeling a bit stressed from project managing, but the trip to Portland last weekend really made me feel wonderful as I got to see many former students and get caught up on their successful lives. Caitlin got married to Mark, and hosted a garden reception to celebrate. They have a wonderful place in Northeast Portland. It reminded me of how important those years were to my life and how I wish I could teach again. They are all such wonderfully talented people.

IMG_6991

Yesterday, a neighbor came by with her son to see the house. She is dealing with the same issues from Rheumatoid Arthritis that my mom did for many, many years. One of the conditions is wafer thin skin that can break and bleed at any tiny bump to it. She had bumped it in the morning and it opened up in our house. Suddenly, I was back years ago to the year before my mom passed when she was in such pain, and the daily trips to see her in hospital. This woman is brave, as was my mom, but it gave me the chance to see the house in a new light – we may move, change our lives completely, but memories are indelible, and they will continue to color our lives in unexpected ways. The rest of the day I spent sitting on the sky deck remembering – and hoping that my neighbor feels no embarrassment, and that her life will be long and blessed.

IMG_6990

And now, pre-windows, our house looks like this. I’m sure I will perk up considerably this week knowing that we are on the home stretch to moving in.

Full-time ‘Streamers

IMG_6469 - Version 2

Tonight we become full-time ‘streamers in our own backyard as we begin remodeling our home we’ve named Casa Vista del Lago Azul. We will probably be living in it for 3 months as the house is taken down to the studs and completely rebuilt except for some wonderful hardwood floors. It’s been nearly a year to get to this point, but we are finally moving forward. We’ll post our progress, but for this week, it’s all about removing stucco off the house and demoing the main floor now that the 2nd floor is mostly demoed.

Now that the project is out of our hands, I’ll get back to work writing and helping out wherever I can. John has another few weeks of work and then we’ll see what’s what.

We will most likely head out for weekend trips or during the week to get away from the mess and chaos. Looking forward to camping and enjoying the outdoors.

Stay tuned….